Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0017 # 03 Y:1985 | 03 | 1985 | INSTALL TURBULATORS | $518 | $300 | Not Implemented |
CO0017 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $400 | Not Implemented |
CO0017 # 05 Y:1985 | 05 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,616 | $2,800 | Implemented |
KU0139 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,499 | $5,941 | Not Implemented |
KU0139 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,988 | $3,000 | Not Implemented |
KU0139 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $818 | $100 | Not Implemented |
KU0139 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,181 | $1,600 | Not Implemented |
KU0139 # 05 Y:1984 | 05 | 1984 | IMPROVE LUBRICATION PRACTICES | $593 | $500 | Not Implemented |
KU0139 # 06 Y:1984 | 06 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $389 | $500 | Not Implemented |
KU0139 # 07 Y:1984 | 07 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $103 | $0 | Not Implemented |
KU0139 # 08 Y:1984 | 08 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $118 | $0 | Not Implemented |
KU0139 # 09 Y:1984 | 09 | 1984 | INSULATE BARE EQUIPMENT | $148 | $64 | Not Implemented |
TN0208 # 01 Y:1984 | 01 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $2,708 | $132 | Not Implemented |
TN0208 # 02 Y:1984 | 02 | 1984 | INSTALL STORM WINDOWS AND DOORS | $731 | $123 | Not Implemented |
TN0208 # 03 Y:1984 | 03 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $120 | $10 | Not Implemented |
TN0213 # 01 Y:1984 | 01 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $375 | $1,240 | Not Implemented |
TN0213 # 02 Y:1984 | 02 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $228 | $0 | Not Implemented |
TN0213 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $35 | $0 | Not Implemented |
TN0200 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $2,865 | $3,200 | Not Implemented |
TN0200 # 02 Y:1984 | 02 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,371 | $0 | Implemented |
TN0200 # 03 Y:1984 | 03 | 1984 | INSULATE BARE EQUIPMENT | $189 | $350 | Implemented |
UD0106 # 01 Y:1983 | 01 | 1983 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,583 | $4,300 | Implemented |
UD0106 # 02 Y:1983 | 02 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,290 | $18,216 | Not Implemented |
UD0106 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,363 | $2,153 | Implemented |
KU0102 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $612 | $1,228 | Not Implemented |