IAC logo
IAC Assessment: KU0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product TEST EQUIP FOR ELECRICAL WIRE
NAICS n/a
SIC 3825 - Instruments To Measure Electricity
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 2,000 Pieces
Production Hrs. Annual 2,125
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,950 1,601,114 kWh $0.07
Natural Gas $7,010 1,696 MMBtu $4.13
TOTAL ENERGY COSTS $115,960
RECOMMENDED SAVINGS* $29,351 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,209
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$11,062
Cost:
$4,000
- - $322 78 $10,740 - -
-
kWh
$322
78
MMBtu
$10,740
-
$
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$190
Cost:
$10
$30 586 $160 39 - - $30
586
kWh
$160
39
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,598
Cost:
$10,800
$7,598 111,665 - - - - $7,598
111,665
kWh
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,188
Cost:
$1,000
$4,048 59,496 $1,140 276 - - $4,048
59,496
kWh
$1,140
276
MMBtu
-
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,800
Cost:
$300
$1,800 26,377 - - - - $1,800
26,377
kWh
-
-
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,080
Cost:
$1,500
$2,080 - - - - - $2,080
-
kWh
-
-
MMBtu
-
-
$
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$730
Cost:
$117
$69 1,172 $661 160 - - $69
1,172
kWh
$661
160
MMBtu
-
-
$
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$303
Cost:
$750
- - $303 73 - - -
-
kWh
$303
73
MMBtu
-
-
$
09: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$285
Cost:
-
- - $285 69 - - -
-
kWh
$285
69
MMBtu
-
-
$
10: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$115
Cost:
$250
$140 2,052 - - $(-25) - $140
2,052
kWh
-
-
MMBtu
$(-25)
-
$
TOTAL RECOMMENDED Savings:
$29,351
Cost:
$18,727
$15,765 201,348 $2,871 695 $10,715 - $15,765
201,348
kWh
$2,871
695
MMBtu
$10,715
-
$
TOTAL IMPLEMENTED Savings:
$16,209
Cost:
$13,227
$13,685 201,348 $2,549 617 $(-25) - $13,685
201,348
kWh
$2,549
617
MMBtu
$(-25)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes