Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0527 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $2,621 | $1,330 | Implemented |
LE0527 # 01 Y:2022 | 01 | 2022 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,805 | $0 | Implemented |
LE0527 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $103 | $40 | Not Implemented |
LE0527 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,500 | $3,435 | Implemented |
LE0527 # 07 Y:2022 | 07 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,154 | $160,000 | Implemented |
LE0527 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $32,527 | $500,000 | Implemented |
LE0527 # 06 Y:2022 | 06 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,260 | $8,500 | Not Implemented |
LE0367 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,213 | $15,750 | Implemented |
LE0367 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,499 | $990 | Not Implemented |
LE0367 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,354 | $9,800 | Not Implemented |
LE0367 # 03 Y:2013 | 03 | 2013 | INSTALL TIMERS AND/OR THERMOSTATS | $1,711 | $0 | Implemented |
LE0367 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,606 | $15,100 | Not Implemented |
LE0367 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,516 | $1,350 | Implemented |
LE0367 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,165 | $16,000 | Not Implemented |
LE0367 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,515 | $500 | Not Implemented |
LE0234 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $5,320 | $1,500 | Implemented |
LE0234 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $3,490 | Implemented |
LE0234 # 08 Y:2006 | 08 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $593 | $60 | Implemented |
LE0234 # 01 Y:2006 | 01 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $190,924 | $500,000 | Implemented |
LE0234 # 03 Y:2006 | 03 | 2006 | OPTIMIZE PLANT POWER FACTOR | $21,102 | $32,700 | Not Implemented |
LE0234 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $22,567 | $1,250 | Not Implemented |
LE0234 # 02 Y:2006 | 02 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $46,545 | $3,000 | Implemented |
LE0234 # 05 Y:2006 | 05 | 2006 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $10,090 | $6,000 | Implemented |
LE0210 # 07 Y:2005 | 07 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $147 | $360 | Not Implemented |
LE0210 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,088 | $750 | Implemented |