IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0139 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,988 $3,000 Not Implemented
KU0139 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $818 $100 Not Implemented
KU0139 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,181 $1,600 Not Implemented
KU0139 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $593 $500 Not Implemented
KU0139 # 06 Y:1984 06 1984 INSTALL AUTOMATIC STACK DAMPER $389 $500 Not Implemented
KU0139 # 07 Y:1984 07 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $103 $0 Not Implemented
KU0139 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Not Implemented
KU0139 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $148 $64 Not Implemented
KU0139 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,499 $5,941 Not Implemented
TN0213 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35 $0 Not Implemented
TN0213 # 02 Y:1984 02 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $228 $0 Not Implemented
TN0213 # 01 Y:1984 01 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $375 $1,240 Not Implemented
TN0208 # 03 Y:1984 03 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $120 $10 Not Implemented
TN0208 # 02 Y:1984 02 1984 INSTALL STORM WINDOWS AND DOORS $731 $123 Not Implemented
TN0208 # 01 Y:1984 01 1984 AIR CONDITION ONLY SPACE NECESSARY $2,708 $132 Not Implemented
TN0200 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $189 $350 Implemented
TN0200 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,371 $0 Implemented
TN0200 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,865 $3,200 Not Implemented