IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0100 # 13 Y:1987 13 1987 AIR CONDITION ONLY SPACE NECESSARY $3,390 $5,100 Implemented
CO0100 # 12 Y:1987 12 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $631 $1,400 Not Implemented
CO0100 # 11 Y:1987 11 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,700 $400 Implemented
CO0100 # 10 Y:1987 10 1987 INSTALL TIMERS AND/OR THERMOSTATS $13,949 $6,000 Implemented
CO0100 # 09 Y:1987 09 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,768 $5,000 Not Implemented
CO0100 # 08 Y:1987 08 1987 ISOLATE HOT OR COLD EQUIPMENT $9,865 $6,000 Implemented
CO0100 # 07 Y:1987 07 1987 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $20,936 $2,000 Implemented
CO0100 # 06 Y:1987 06 1987 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,877 $125 Implemented
CO0100 # 05 Y:1987 05 1987 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,817 $250 Implemented
CO0100 # 04 Y:1987 04 1987 OPERATE BOILERS ON HIGH FIRE SETTING $3,445 $1,500 Not Implemented
CO0100 # 03 Y:1987 03 1987 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $50,411 $138,000 Implemented
CO0100 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,308 $300 Implemented
CO0100 # 02 Y:1987 02 1987 DIRECT WARMEST AIR TO COMBUSTION INTAKE $242 $450 Not Implemented
KU0230 # 02 Y:1987 02 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,808 $1,200 Not Implemented
KU0230 # 12 Y:1987 12 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $121 $520 Implemented
KU0230 # 11 Y:1987 11 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $191 $0 Implemented
KU0230 # 10 Y:1987 10 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $500 Not Implemented
KU0230 # 09 Y:1987 09 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $314 $205 Implemented
KU0230 # 08 Y:1987 08 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $437 $0 Implemented
KU0230 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $605 $90 Not Implemented
KU0230 # 06 Y:1987 06 1987 IMPROVE LUBRICATION PRACTICES $677 $400 Not Implemented
KU0230 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,040 $0 Implemented
KU0230 # 04 Y:1987 04 1987 INSTALL AUTOMATIC STACK DAMPER $1,486 $2,600 Implemented
KU0230 # 03 Y:1987 03 1987 HEAT WATER WITH EXHAUST HEAT $3,795 $7,000 Not Implemented
KU0230 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,144 $615 Implemented