IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

157

matching recommendations
Reset
SIC 3821 Laboratory Apparatus And Furniture
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0423 # 05 Y:2023 05 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,196 $27,500 Not Implemented
MI0423 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,808 $580 Implemented
MI0423 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $41,834 $0 Implemented
MI0423 # 09 Y:2023 09 2023 AIR CONDITION ONLY SPACE NECESSARY $1,771 $900 Not Implemented
MI0423 # 08 Y:2023 08 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,131 $1,500 Implemented
MI0423 # 10 Y:2023 10 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $277 $1,360 Implemented
MI0423 # 06 Y:2023 06 2023 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,580 $1,455 Not Implemented
MI0423 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,513 $51,984 Implemented
MI0423 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $4,508 $1,250 Implemented
MI0423 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,785 $37,678 Implemented
OR0650 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $719 $1,200 Implemented
OR0650 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $23,922 $24,660 Not Implemented
OR0650 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,001 $2,678 Not Implemented
OR0650 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $16,731 $135,510 Not Implemented
OR0650 # 01 Y:2015 01 2015 ELIMINATE/REDUCE AN OPERATION $20,348 $2,295 Not Implemented
OR0650 # 05 Y:2015 05 2015 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $1,291 $4,404 Implemented
SF0466 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,026 $4,733 Implemented
SF0466 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,015 $5,614 Implemented
SF0466 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $5,556 $6,409 Implemented
SF0466 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,885 $5,614 Implemented
SF0466 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,752 $2,224 Implemented
SF0466 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,438 $0 Not Implemented
MI0272 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,714 $2,680 Not Implemented
MI0272 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $811 $3,060 Implemented
MI0272 # 10 Y:2015 10 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $727 $2,044 Not Implemented