Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
157
matching recommendationsSIC | 3821 | Laboratory Apparatus And Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0423 # 05 Y:2023 | 05 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,196 | $27,500 | Not Implemented |
MI0423 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,808 | $580 | Implemented |
MI0423 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $41,834 | $0 | Implemented |
MI0423 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $1,771 | $900 | Not Implemented |
MI0423 # 08 Y:2023 | 08 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,131 | $1,500 | Implemented |
MI0423 # 10 Y:2023 | 10 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $277 | $1,360 | Implemented |
MI0423 # 06 Y:2023 | 06 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,580 | $1,455 | Not Implemented |
MI0423 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,513 | $51,984 | Implemented |
MI0423 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $4,508 | $1,250 | Implemented |
MI0423 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,785 | $37,678 | Implemented |
OR0650 # 03 Y:2015 | 03 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $719 | $1,200 | Implemented |
OR0650 # 02 Y:2015 | 02 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $23,922 | $24,660 | Not Implemented |
OR0650 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,001 | $2,678 | Not Implemented |
OR0650 # 06 Y:2015 | 06 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,731 | $135,510 | Not Implemented |
OR0650 # 01 Y:2015 | 01 | 2015 | ELIMINATE/REDUCE AN OPERATION | $20,348 | $2,295 | Not Implemented |
OR0650 # 05 Y:2015 | 05 | 2015 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $1,291 | $4,404 | Implemented |
SF0466 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,026 | $4,733 | Implemented |
SF0466 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,015 | $5,614 | Implemented |
SF0466 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $5,556 | $6,409 | Implemented |
SF0466 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,885 | $5,614 | Implemented |
SF0466 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,752 | $2,224 | Implemented |
SF0466 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,438 | $0 | Not Implemented |
MI0272 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,714 | $2,680 | Not Implemented |
MI0272 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $811 | $3,060 | Implemented |
MI0272 # 10 Y:2015 | 10 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $727 | $2,044 | Not Implemented |