49
matching recommendationsSIC | 3821 | Laboratory Apparatus And Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0650 # 01 Y:2015 | 01 | 2015 | ELIMINATE/REDUCE AN OPERATION | $20,348 | $2,295 | Not Implemented |
OR0650 # 02 Y:2015 | 02 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $23,922 | $24,660 | Not Implemented |
OR0650 # 03 Y:2015 | 03 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $719 | $1,200 | Implemented |
OR0650 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,001 | $2,678 | Not Implemented |
OR0650 # 05 Y:2015 | 05 | 2015 | HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE | $1,291 | $4,404 | Implemented |
OR0650 # 06 Y:2015 | 06 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,731 | $135,510 | Not Implemented |
SF0466 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,026 | $4,733 | Implemented |
SF0466 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,015 | $5,614 | Implemented |
SF0466 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,885 | $5,614 | Implemented |
SF0466 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,752 | $2,224 | Implemented |
SF0466 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $5,556 | $6,409 | Implemented |
SF0466 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,438 | $0 | Not Implemented |
MI0272 # 08 Y:2015 | 08 | 2015 | USE PHOTOCELL CONTROLS | $1,053 | $360 | Not Implemented |
MI0272 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $108,119 | $1,400 | Not Implemented |
MI0272 # 02 Y:2015 | 02 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $59,120 | $60,000 | Not Implemented |
MI0272 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,227 | $27,707 | Implemented |
MI0272 # 04 Y:2015 | 04 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,994 | $80 | Not Implemented |
MI0272 # 05 Y:2015 | 05 | 2015 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,265 | $11,000 | Not Implemented |
MI0272 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,714 | $2,680 | Not Implemented |
MI0272 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,059 | $373 | Not Implemented |
MI0272 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $811 | $3,060 | Implemented |
MI0272 # 10 Y:2015 | 10 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $727 | $2,044 | Not Implemented |
MI0272 # 11 Y:2015 | 11 | 2015 | USE OPTIMUM THICKNESS INSULATION | $88 | $360 | Not Implemented |
MI0271 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,369 | $4,590 | Implemented |
MI0271 # 11 Y:2015 | 11 | 2015 | INSTALL OCCUPANCY SENSORS | $956 | $373 | Implemented |