Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 3823 | Process Control Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0868 # 08 Y:2013 | 08 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,338 | $305 | Not Implemented |
OK0868 # 13 Y:2013 | 13 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $33,598 | $0 | Implemented |
OK0868 # 12 Y:2013 | 12 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,328 | $7,958 | Not Implemented |
OK0868 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,457 | $13,371 | Implemented |
OK0868 # 10 Y:2013 | 10 | 2013 | INSTALL OCCUPANCY SENSORS | $915 | $4,669 | Not Implemented |
OK0868 # 06 Y:2013 | 06 | 2013 | INSTALL SET-BACK TIMERS | $3,871 | $606 | Implemented |
OK0868 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,572 | $7,700 | Implemented |
OK0868 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,424 | $2,973 | Not Implemented |
OK0868 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,347 | $750 | Implemented |
OK0868 # 07 Y:2013 | 07 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $7,022 | $1,140 | Implemented |
OK0868 # 09 Y:2013 | 09 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $287 | $456 | Implemented |
OK0868 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,626 | $14,640 | Not Implemented |
OK0868 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,792 | $1,851 | Implemented |
AM0430 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $850 | $77 | Implemented |
AM0430 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,300 | $0 | Implemented |
AM0430 # 04 Y:2003 | 04 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,840 | $700 | Implemented |
AM0430 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,770 | $9,000 | Not Implemented |
AM0430 # 02 Y:2003 | 02 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,620 | $340 | Not Implemented |
AM0430 # 07 Y:2003 | 07 | 2003 | REUSE RAGS UNTIL COMPLETELY SOILED | $795 | $0 | Implemented |
AM0430 # 01 Y:2003 | 01 | 2003 | USE WATER-BASED ADHESIVES | $51,560 | $10,000 | Not Implemented |
AM0430 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $280 | $90 | Not Implemented |
AM0430 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $630 | Not Implemented |
AM0430 # 10 Y:2003 | 10 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $180 | $0 | Implemented |
AM0114 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $635 | $205 | Not Implemented |
AM0114 # 02 Y:1991 | 02 | 1991 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,900 | $13,600 | Not Implemented |