Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
18
matching recommendationsSIC | 3827 | Optical Instruments And Lenses |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0624 # 08 Y:2024 | 08 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $23,221 | $60,000 | n/a |
UF0624 # 07 Y:2024 | 07 | 2024 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $38,400 | $100,000 | n/a |
UF0624 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,844 | $6,000 | n/a |
UF0624 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,280 | $0 | n/a |
UF0624 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,033 | $25,340 | n/a |
UF0624 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,217 | $21,658 | n/a |
UF0624 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,908 | $14,359 | n/a |
UF0624 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,131 | $322,608 | n/a |
MI0237 # 10 Y:2013 | 10 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $396 | $1,880 | Implemented |
MI0237 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,474 | $10,160 | Implemented |
MI0237 # 09 Y:2013 | 09 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $639 | $1,240 | Not Implemented |
MI0237 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $714 | $205 | Implemented |
MI0237 # 07 Y:2013 | 07 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,045 | $40 | Implemented |
MI0237 # 06 Y:2013 | 06 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,104 | $2,406 | Implemented |
MI0237 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,565 | $1,660 | Implemented |
MI0237 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,086 | $80 | Implemented |
MI0237 # 03 Y:2013 | 03 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,143 | $2,188 | Not Implemented |
MI0237 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,857 | $80 | Implemented |