Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsSIC | 3829 | Measuring & Controlling Devices, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0080 # 10 Y:1996 | 10 | 1996 | CONVERT TO AQUEOUS CLEANING SYSTEM | $1,660 | $5,561 | Implemented |
SD0088 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,963 | $4,300 | Implemented |
SD0088 # 02 Y:1994 | 02 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,722 | $200 | Implemented |
SD0088 # 03 Y:1994 | 03 | 1994 | INSULATE BARE EQUIPMENT | $376 | $235 | Implemented |
SD0088 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,853 | $150 | Implemented |
SD0088 # 05 Y:1994 | 05 | 1994 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $117,014 | $245,000 | Implemented |
SD0088 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,436 | $95,019 | Implemented |
SD0088 # 07 Y:1994 | 07 | 1994 | INSTALL SPECTRAL REFLECTORS / DELAMP | $39,115 | $43,220 | Implemented |
SD0088 # 08 Y:1994 | 08 | 1994 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,548 | $810 | Implemented |
WV0029 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,087 | $1,173 | Implemented |
WV0029 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $475 | $300 | Implemented |
WV0029 # 04 Y:1994 | 04 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $279 | $0 | Implemented |
WV0029 # 07 Y:1994 | 07 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $192 | $15 | Implemented |
WV0029 # 08 Y:1994 | 08 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $303 | Implemented |
WV0029 # 10 Y:1994 | 10 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $207 | $0 | Implemented |
WV0029 # 11 Y:1994 | 11 | 1994 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $227 | $0 | Implemented |
WV0029 # 12 Y:1994 | 12 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $995 | $260 | Implemented |
KU0406 # 01 Y:1993 | 01 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,316 | $3,168 | Implemented |
KU0406 # 03 Y:1993 | 03 | 1993 | COVER OPEN TANKS | $1,525 | $1,125 | Implemented |
KU0406 # 04 Y:1993 | 04 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $572 | $489 | Implemented |
KU0406 # 06 Y:1993 | 06 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $290 | $30 | Implemented |
ND0041 # 01 Y:1992 | 01 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,695 | $4,000 | Implemented |
ND0041 # 03 Y:1992 | 03 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,344 | $1,200 | Implemented |
ND0041 # 04 Y:1992 | 04 | 1992 | INSTALL STORM WINDOWS AND DOORS | $996 | $750 | Implemented |
ND0041 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $204 | $692 | Implemented |