IAC logo
IAC Assessment: ND0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1992
Principal Product CUSTOM TESTING MACHINERY
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000 Pounds
Production Hrs. Annual 5,460
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,874 921,454 kWh $0.06
Natural Gas $20,797 4,326 MMBtu $4.81
Other Energy $290 4 MMBtu $72.50
TOTAL ENERGY COSTS $75,961
RECOMMENDED SAVINGS* $6,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,512
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,695
Cost:
$4,000
$2,695 45,135 - - - - - - $2,695
45,135
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$237
Cost:
$4,770
$237 4,103 - - - - - - $237
4,103
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,344
Cost:
$1,200
$1,344 22,567 - - - - - - $1,344
22,567
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$996
Cost:
$750
- - $996 207 - - - - -
-
kWh
$996
207
MMBtu
-
-
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$656
Cost:
$354
$656 11,137 - - - - - - $656
11,137
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$692
$378 6,448 - - - - $(-174) - $378
6,448
kWh
-
-
MMBtu
-
-
MMBtu
$(-174)
-
$
07: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$273
Cost:
$450
- - $(-17) (-3) $290 3 - - -
-
kWh
$(-17)
(-3)
MMBtu
$290
3
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$244
Cost:
$300
$244 4,103 - - - - - - $244
4,103
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$110
Cost:
$200
$110 1,758 - - - - - - $110
1,758
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,759
Cost:
$12,716
$5,664 95,251 $979 204 $290 3 $(-174) - $5,664
95,251
kWh
$979
204
MMBtu
$290
3
MMBtu
$(-174)
-
$
TOTAL IMPLEMENTED Savings:
$5,512
Cost:
$7,092
$4,417 74,150 $979 204 $290 3 $(-174) - $4,417
74,150
kWh
$979
204
MMBtu
$290
3
MMBtu
$(-174)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes