IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,840

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0583 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,987 $62,001 Implemented
UF0583 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,746 $33,000 Implemented
UF0583 # 04 Y:2022 04 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,240 $0 Implemented
UF0583 # 05 Y:2022 05 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $273,973 $0 Not Implemented
UF0583 # 06 Y:2022 06 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $58,774 $10,000 Not Implemented
NL0069 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $459,130 $2,266,822 Not Implemented
NL0069 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100,270 $900 Not Implemented
NL0069 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $64,154 $20,000 Not Implemented
NL0069 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,908 $110,400 Not Implemented
NL0069 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $10,312 $3,180 Not Implemented
NL0069 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,221 $1,069 Not Implemented
NL0069 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $599 $1,397 Not Implemented
MZ0329 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $382 $240 Not Implemented
MZ0329 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,529 $20,439 Implemented
MZ0329 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $540 $3,202 Not Implemented
MZ0329 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,471 $60,924 Not Implemented
MZ0329 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $583 $960 Implemented
MZ0329 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $983 $150 Implemented
MZ0329 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,853 $4,331 Not Implemented
LE0528 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,359 $40 Not Implemented
LE0528 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,953 $1,000 Implemented
LE0528 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $150,000 $90,000 Implemented
LE0528 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,512 $150 Implemented
LE0528 # 05 Y:2022 05 2022 UPGRADE OBSOLETE EQUIPMENT $150,000 $150,000 Implemented
LE0528 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,188 $2,000 Not Implemented