IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,788

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0638 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,536 $500 Not Implemented
OK0638 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $623 $1,067 Implemented
OK0638 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,046 $10 Not Implemented
SU0136 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,000 $0 Not Implemented
SU0136 # 02 Y:2002 02 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,245 $0 Implemented
SU0136 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,526 $270 Not Implemented
SU0136 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,696 $60 Not Implemented
SU0136 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,332 $107 Not Implemented
SU0136 # 06 Y:2002 06 2002 REDUCE VENTILATION AIR $1,494 $104 Not Implemented
SU0136 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $1,836 $5,750 Not Implemented
SU0136 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,654 $0 Implemented
SU0136 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,569 $0 Not Implemented
SU0136 # 10 Y:2002 10 2002 INSULATE BARE EQUIPMENT $1,249 $700 Not Implemented
SU0136 # 11 Y:2002 11 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $928 $63 Implemented
SU0136 # 12 Y:2002 12 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $928 $0 Implemented
SU0136 # 13 Y:2002 13 2002 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $379 $5 Implemented
SU0136 # 14 Y:2002 14 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $219 $0 Implemented
SU0136 # 15 Y:2002 15 2002 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $196 $60 Not Implemented
SU0136 # 16 Y:2002 16 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $140 $0 Implemented
UU0018 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,387 $127,085 Implemented
UU0018 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,498 $1,588 Not Implemented
UU0018 # 03 Y:2001 03 2001 USE SYNTHETIC LUBRICANT $1,814 $0 Not Implemented
UU0018 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,006 $1,000 Implemented
UU0018 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $4,721 $1,900 Implemented
UF0287 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $920 Implemented