IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,788

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0282 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,580 $120 Implemented
AS0282 # 08 Y:2000 08 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $624 $60 Implemented
AS0282 # 09 Y:2000 09 2000 $292,414 $1,000,000 Not Implemented
IA0240 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,330 $0 Implemented
IA0240 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,222 $0 Implemented
IA0240 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,996 $463 Implemented
IA0240 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,204 $100 Implemented
IA0240 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,648 $623 Implemented
GT0684 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,160 $0 Not Implemented
GT0684 # 02 Y:2000 02 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,325 $0 Not Implemented
GT0684 # 03 Y:2000 03 2000 USE POWER DURING OFF-PEAK PERIODS $1,975 $0 Not Implemented
GT0684 # 04 Y:2000 04 2000 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $1,632 $2,450 Not Implemented
GT0684 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,200 $19,600 Not Implemented
MA0443 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,232 $3,510 Not Implemented
MA0443 # 02 Y:1999 02 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $656 $150 Implemented
MA0443 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $927 $325 Implemented
MA0443 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $1,975 Implemented
MA0443 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $792 $60 Implemented
MA0443 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $160 Not Implemented
ND0331 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $1,714 $1,600 Not Implemented
ND0331 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,675 $500 Not Implemented
ND0331 # 03 Y:1999 03 1999 DEVELOP A REPAIR/REPLACE POLICY $992 $2,732 Not Implemented
ND0331 # 04 Y:1999 04 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $899 $300 Implemented
ND0331 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $220 Implemented
ND0331 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $532 $595 Not Implemented