IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0333 # 09 Y:2002 09 2002 CLEAR AND RENT EXISTING SPACE $201,600 $12,820 Not Implemented
AS0333 # 08 Y:2002 08 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,852 $60 Not Implemented
AS0333 # 07 Y:2002 07 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $684 $0 Not Implemented
AS0333 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,272 $60 Implemented
AS0333 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $597 $20 Implemented
AS0333 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $156 $60 Not Implemented
AS0333 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,336 $22,750 Not Implemented
AS0333 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,566 $666 Not Implemented
AS0333 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $1,116 $3,300 Not Implemented
AS0329 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $615 $1,500 Not Implemented
AS0329 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $737 Implemented
AS0329 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $94 $48 Not Implemented
AS0329 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,444 $43,930 Not Implemented
AS0329 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,200 $13,655 Not Implemented
AS0282 # 09 Y:2000 09 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $292,414 $1,000,000 Not Implemented
AS0282 # 08 Y:2000 08 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $624 $60 Implemented
AS0282 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,580 $120 Implemented
AS0282 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,843 $4,974 Implemented
AS0282 # 05 Y:2000 05 2000 USE SYNTHETIC LUBRICANT $1,793 $694 Not Implemented
AS0282 # 01 Y:2000 01 2000 ADD AREA LIGHTING SWITCHES $3,618 $2,270 Not Implemented
AS0282 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $959 $120 Implemented
AS0282 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $697 $536 Implemented
AS0282 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,563 $60 Implemented
AS0084 # 04 Y:1993 04 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,723 $0 Implemented
AS0084 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $240 $83 Implemented