IAC logo
IAC Assessment: AS0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product ULTRASONIC MED. EQUIP.
NAICS n/a
SIC 3845 - Electromedical Equipment
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 277 Pieces
Production Hrs. Annual 4,940
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,528 3,776,671 kWh $0.07
TOTAL ENERGY COSTS $249,528
RECOMMENDED SAVINGS* $13,133 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,085
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$5,468
Cost:
$3,050
$5,468 - $5,468
-
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$122
Cost:
$238
$122 1,758 $122
1,758
kWh
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$331
Cost:
$1,500
$331 4,982 $331
4,982
kWh
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$1,723
Cost:
-
$1,723 26,084 $1,723
26,084
kWh
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$240
Cost:
$83
$240 3,517 $240
3,517
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,618
Cost:
$1,900
$3,618 54,807 $3,618
54,807
kWh
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,285
Cost:
$900
$1,285 19,343 $1,285
19,343
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$346
Cost:
$600
$346 5,275 $346
5,275
kWh
TOTAL RECOMMENDED Savings:
$13,133
Cost:
$8,271
$13,133 115,766 $13,133
115,766
kWh
TOTAL IMPLEMENTED Savings:
$2,085
Cost:
$321
$2,085 31,359 $2,085
31,359
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage