Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
82
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0812 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,190 | $5,960 | Implemented |
MA0812 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,615 | $32,940 | Implemented |
MA0812 # 02 Y:2020 | 02 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $56,847 | $3,250 | Not Implemented |
MA0812 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $228,815 | $892,794 | Not Implemented |
MA0812 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,774 | $16,650 | Implemented |
MA0812 # 06 Y:2020 | 06 | 2020 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,604 | $500 | Not Implemented |
MA0813 # 04 Y:2020 | 04 | 2020 | OPTIMIZE PLANT POWER FACTOR | $4,535 | $8,890 | Not Implemented |
MA0813 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,915 | $1,000 | Not Implemented |
MA0813 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $60,067 | $253,810 | Not Implemented |
MA0813 # 05 Y:2020 | 05 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,060 | $9,957 | Not Implemented |
MA0813 # 02 Y:2020 | 02 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,202 | $27,887 | Not Implemented |
MA0811 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,545 | $1,000 | Not Implemented |
MA0811 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,160 | $156,897 | Not Implemented |
MA0811 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,088 | $135,643 | Not Implemented |
MA0811 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $31,083 | $27,315 | Not Implemented |
MA0811 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,468 | $75,632 | Not Implemented |
MA0811 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $380 | $1,000 | Not Implemented |
MA0811 # 05 Y:2020 | 05 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,738 | $14,935 | Not Implemented |
MA0811 # 08 Y:2020 | 08 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $676 | $500 | Not Implemented |
MA0804 # 03 Y:2019 | 03 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $25,240 | $1,000 | Not Implemented |
MA0804 # 05 Y:2019 | 05 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,134 | $1,000 | Implemented |
MA0804 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,014 | $300 | Implemented |
MA0804 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $100,108 | $144,760 | Implemented |
MA0804 # 01 Y:2019 | 01 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $227,379 | $500 | Not Implemented |
MA0793 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,323 | $28,940 | Not Implemented |