Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0434 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $2,500 | Implemented |
UM0434 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,445 | $8,750 | Not Implemented |
UM0434 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,479 | $4,000 | Not Implemented |
UM0434 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,027 | $200 | Not Implemented |
UM0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,543 | $17,630 | Implemented |
UM0434 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,289 | $500 | Not Implemented |
UM0434 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,121 | $16,500 | Implemented |
SU0350 # 06 Y:2013 | 06 | 2013 | INSULATE FEEDWATER TANK | $579 | $190 | Implemented |
SU0350 # 03 Y:2013 | 03 | 2013 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,239 | $0 | Implemented |
SU0350 # 02 Y:2013 | 02 | 2013 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $8,049 | $0 | Implemented |
SU0350 # 11 Y:2013 | 11 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $221 | $616 | Implemented |
SU0350 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $579 | $340 | Implemented |
SU0350 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $347 | $771 | Implemented |
SU0350 # 10 Y:2013 | 10 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $298 | $705 | Not Implemented |
SU0350 # 08 Y:2013 | 08 | 2013 | ELIMINATE/REDUCE AN OPERATION | $18,624 | $29,949 | Not Implemented |
SU0350 # 12 Y:2013 | 12 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $189 | $852 | Implemented |
SU0350 # 05 Y:2013 | 05 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $741 | $191 | Implemented |
SU0350 # 04 Y:2013 | 04 | 2013 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $30,158 | $131 | Implemented |
SU0350 # 01 Y:2013 | 01 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,408 | $0 | Implemented |
UM0432 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,532 | $200 | Implemented |
UM0432 # 01 Y:2013 | 01 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,000 | $10,000 | Implemented |
UM0432 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $8,484 | $15,000 | Not Implemented |
UM0432 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $2,500 | Implemented |
LE0359 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,953 | $500 | Not Implemented |
LE0359 # 05 Y:2013 | 05 | 2013 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $2,575 | $22 | Implemented |