Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
187
matching recommendationsSIC | 3841 | Surgical And Medical Instruments |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0208 # 04 Y:2011 | 04 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,075 | $2,550 | Not Implemented |
MI0208 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,241 | $20,530 | Not Implemented |
MI0208 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,355 | $1,320 | Implemented |
MI0208 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,789 | $2,400 | Implemented |
MI0207 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $123,852 | $137,314 | Not Implemented |
MI0207 # 02 Y:2011 | 02 | 2011 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $76,417 | $150,000 | Not Implemented |
MI0207 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $61,926 | $2,550 | Implemented |
MI0207 # 04 Y:2011 | 04 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $33,207 | $8,474 | Not Implemented |
MI0207 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,901 | $1,320 | Implemented |
MI0207 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,650 | $9,200 | Not Implemented |
UF0399 # 01 Y:2007 | 01 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,373 | $24,800 | Not Implemented |
UF0399 # 02 Y:2007 | 02 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $349 | $1,376 | Not Implemented |
UF0399 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,878 | $437 | Implemented |
UF0399 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,852 | $0 | Implemented |
UF0399 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM THICKNESS INSULATION | $1,157 | $188 | Not Implemented |
UF0399 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $939 | $0 | Not Implemented |
UF0399 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,311 | $44,692 | Not Implemented |
UF0399 # 08 Y:2007 | 08 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $47,277 | $35,000 | Not Implemented |
UF0399 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,017 | $1,719 | Not Implemented |
UF0399 # 10 Y:2007 | 10 | 2007 | INSTALL OCCUPANCY SENSORS | $1,761 | $404 | Implemented |
UF0399 # 11 Y:2007 | 11 | 2007 | RECYCLE FLUORESCENT LAMPS | $1,005 | $3,486 | Implemented |
UF0399 # 12 Y:2007 | 12 | 2007 | CHANGE OPERATING CONDITIONS | $74,852 | $731 | Implemented |
MI0111 # 01 Y:2005 | 01 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,372 | $200 | Not Implemented |
MI0111 # 02 Y:2005 | 02 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,290 | $84 | Implemented |
MI0111 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,062 | $7,706 | Implemented |