IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0812 # 06 Y:2020 06 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,604 $500 Not Implemented
MA0812 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,774 $16,650 Implemented
MA0812 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,190 $5,960 Implemented
MA0812 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,615 $32,940 Implemented
MA0812 # 02 Y:2020 02 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $56,847 $3,250 Not Implemented
MA0812 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $228,815 $892,794 Not Implemented
MA0813 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,060 $9,957 Not Implemented
MA0813 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $4,535 $8,890 Not Implemented
MA0813 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,915 $1,000 Not Implemented
MA0813 # 02 Y:2020 02 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,202 $27,887 Not Implemented
MA0813 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $60,067 $253,810 Not Implemented
MA0811 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $37,160 $156,897 Not Implemented
MA0811 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,738 $14,935 Not Implemented
MA0811 # 08 Y:2020 08 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $676 $500 Not Implemented
MA0811 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,545 $1,000 Not Implemented
MA0811 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,468 $75,632 Not Implemented
MA0811 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $31,083 $27,315 Not Implemented
MA0811 # 02 Y:2020 02 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $32,088 $135,643 Not Implemented
MA0811 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $1,000 Not Implemented
MA0804 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $300 Implemented
MA0804 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $227,379 $500 Not Implemented
MA0804 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100,108 $144,760 Implemented
MA0804 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,134 $1,000 Implemented
MA0804 # 03 Y:2019 03 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $25,240 $1,000 Not Implemented
MA0789 # 04 Y:2018 04 2018 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,881 $6,120 Not Implemented