IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1053 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $46,233 $119,156 Not Implemented
UD1053 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $7,370 $110,000 Implemented
UD1053 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $110,000 Implemented
UD1053 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,100 $201,500 Not Implemented
UD1053 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $288,790 $110,000 Implemented
UD1053 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,943 $0 Not Implemented
UD1053 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $103,216 $145,725 Not Implemented
UD1053 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,508 $19,116 Not Implemented
UD1053 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,937 $0 Not Implemented
UD0821 # 09 Y:2010 09 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $2,560 $5,542 Not Implemented
UD0821 # 11 Y:2010 11 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $669 $400 Not Implemented
UD0821 # 10 Y:2010 10 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,772 $3,500 Implemented
UD0821 # 08 Y:2010 08 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,979 $43,700 Implemented
UD0821 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,766 $25 Not Implemented
UD0821 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,023 $4,000 Not Implemented
UD0821 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $479 $893 Implemented
UD0821 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,341 $60,300 Implemented
UD0821 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,331 $75 Not Implemented
UD0821 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,610 $25 Implemented
UD0821 # 01 Y:2010 01 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $4,575 $300,000 Implemented
UD0228 # 01 Y:1987 01 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,352 $13,000 Implemented
UD0228 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $50 Implemented
UD0228 # 02 Y:1987 02 1987 REDESIGN PROCESS $734 $200 Not Implemented