IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0416 # 08 Y:2022 08 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,431 $280 Implemented
MI0416 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,300 $580 Implemented
MI0416 # 02 Y:2022 02 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,412 $20,515 Implemented
MI0416 # 03 Y:2022 03 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,295 $0 Implemented
MI0416 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,652 $480 Implemented
MI0416 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,879 $2,399 Implemented
MI0416 # 06 Y:2022 06 2022 PAY UTILITY BILLS ON TIME $6,239 $0 Implemented
MI0416 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,973 $2,100 Implemented
NL0074 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,436 $19,905 Not Implemented
NL0074 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,687 $5,590 Not Implemented
NL0074 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $72,974 $20,000 Not Implemented
NL0074 # 01 Y:2022 01 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214,263 $4,242 Not Implemented
NL0074 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $859 $1,225 Not Implemented
NL0074 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $432 $90 Not Implemented
NL0074 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $1,627 $450 Not Implemented
UF0583 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,746 $33,000 Implemented
UF0583 # 06 Y:2022 06 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $58,774 $10,000 Not Implemented
UF0583 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,276 $1,243,750 Implemented
UF0583 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,987 $62,001 Implemented
UF0583 # 04 Y:2022 04 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,240 $0 Implemented
UF0583 # 05 Y:2022 05 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $273,973 $0 Not Implemented
NL0069 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $64,154 $20,000 Not Implemented
NL0069 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $10,312 $3,180 Not Implemented
NL0069 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100,270 $900 Not Implemented
NL0069 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $459,130 $2,266,822 Not Implemented