Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2022 |
Principal Product | Intraocular Lenses |
NAICS | 339112 - Surgical and Medical Instrument Manufacturing |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $100,000,000-$500,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 102,000 |
Annual Production | 4,286,708 Units |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $589,014 | 11,524,402 | kWh | $0.05 |
Electricity Demand | $54,927 | 18,109 | kW-months/year | $3.03 |
Electricity Fees | $103,998 | - | $ | - |
TOTAL ENERGY COSTS | $910,021 | |||
RECOMMENDED SAVINGS* | $713,996 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $381,249 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $308,276 Cost: $1,243,750 |
$486,462 | 9,538,462 | $47,315 | 15,600 | $(-115,001) | (-82,863) | - | - | $(-110,500) | - |
$486,462 9,538,462 kWh |
$47,315 15,600 kW-months/year |
$(-115,001) (-82,863) MMBtu |
- - $ |
$(-110,500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $44,987 Cost: $62,001 |
$41,142 | 806,708 | $3,845 | 1,268 | - | - | - | - | - | - |
$41,142 806,708 kWh |
$3,845 1,268 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,746 Cost: $33,000 |
$13,633 | 267,321 | $1,113 | 367 | - | - | - | - | - | - |
$13,633 267,321 kWh |
$1,113 367 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $13,240 Cost: - |
$13,240 | 259,616 | - | - | - | - | - | - | - | - |
$13,240 259,616 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS |
Savings: $273,973 Cost: - |
- | - | - | - | - | - | $273,973 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$273,973 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $58,774 Cost: $10,000 |
$58,774 | 1,152,440 | - | - | - | - | - | - | - | - |
$58,774 1,152,440 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $713,996 Cost: $1,348,751 |
$613,251 | 12,024,547 | $52,273 | 17,235 | $(-115,001) | (-82,863) | $273,973 | - | $(-110,500) | - | $613,251 12,024,547 kWh |
$52,273 17,235 kW-months/year |
$(-115,001) (-82,863) MMBtu |
$273,973 - $ |
$(-110,500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $381,249 Cost: $1,338,751 |
$554,477 | 10,872,107 | $52,273 | 17,235 | $(-115,001) | (-82,863) | - | - | $(-110,500) | - | $554,477 10,872,107 kWh |
$52,273 17,235 kW-months/year |
$(-115,001) (-82,863) MMBtu |
- - $ |
$(-110,500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |