IAC logo
IAC Assessment: UF0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Intraocular Lenses
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 60
Plant Area (Sq.Ft.) 102,000
Annual Production 4,286,708 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $589,014 11,524,402 kWh $0.05
Electricity Demand $54,927 18,109 kW-months/year $3.03
Electricity Fees $103,998 - $ -
TOTAL ENERGY COSTS $910,021
RECOMMENDED SAVINGS* $713,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $381,249
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$308,276
Cost:
$1,243,750
$486,462 9,538,462 $47,315 15,600 $(-115,001) (-82,863) - - $(-110,500) - $486,462
9,538,462
kWh
$47,315
15,600
kW-months/year
$(-115,001)
(-82,863)
MMBtu
-
-
$
$(-110,500)
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$44,987
Cost:
$62,001
$41,142 806,708 $3,845 1,268 - - - - - - $41,142
806,708
kWh
$3,845
1,268
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,746
Cost:
$33,000
$13,633 267,321 $1,113 367 - - - - - - $13,633
267,321
kWh
$1,113
367
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$13,240
Cost:
-
$13,240 259,616 - - - - - - - - $13,240
259,616
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$273,973
Cost:
-
- - - - - - $273,973 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$273,973
-
$
-
-
$
06: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$58,774
Cost:
$10,000
$58,774 1,152,440 - - - - - - - - $58,774
1,152,440
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$713,996
Cost:
$1,348,751
$613,251 12,024,547 $52,273 17,235 $(-115,001) (-82,863) $273,973 - $(-110,500) - $613,251
12,024,547
kWh
$52,273
17,235
kW-months/year
$(-115,001)
(-82,863)
MMBtu
$273,973
-
$
$(-110,500)
-
$
TOTAL IMPLEMENTED Savings:
$381,249
Cost:
$1,338,751
$554,477 10,872,107 $52,273 17,235 $(-115,001) (-82,863) - - $(-110,500) - $554,477
10,872,107
kWh
$52,273
17,235
kW-months/year
$(-115,001)
(-82,863)
MMBtu
-
-
$
$(-110,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost