IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 385 Ophthalmic Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0015 # 07 Y:1993 07 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,579 $1,400 Implemented
WV0015 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $272 $42 Implemented
WV0015 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $766 $2,995 Implemented
MA0281 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $8,868 $12,000 Not Implemented
MA0281 # 02 Y:1993 02 1993 UPGRADE CONTROLS ON COMPRESSORS $5,907 $4,000 Not Implemented
MA0281 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $3,492 Implemented
MA0281 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,872 $400 Implemented
MA0281 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $1,812 $320 Implemented
MA0281 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $470 $387 Not Implemented
MA0281 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $436 $0 Implemented
MA0281 # 08 Y:1993 08 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $268 $80 Not Implemented
UD0382 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,352 $4,895 Implemented
UD0382 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $177 $0 Not Implemented
UD0382 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $542 $1,000 Not Implemented
UD0382 # 04 Y:1992 04 1992 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $578 $0 Not Implemented
KU0153 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $10,215 $10,000 Implemented
KU0153 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $5,507 $1,300 Implemented
KU0153 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,131 $5,120 Implemented
KU0153 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $2,055 $0 Implemented
KU0153 # 05 Y:1985 05 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,363 $200 Implemented
KU0153 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,250 $2,500 Implemented
KU0153 # 07 Y:1985 07 1985 IMPROVE LUBRICATION PRACTICES $610 $0 Implemented
KU0153 # 08 Y:1985 08 1985 COVER OPEN TANKS $3,927 $600 Implemented
KU0153 # 09 Y:1985 09 1985 USE MINIMUM SAFE OVEN VENTILATION $1,573 $2,800 Implemented
KU0153 # 10 Y:1985 10 1985 AIR CONDITION ONLY SPACE NECESSARY $517 $1,060 Implemented