IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
SIC 3851 Ophthalmic Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0352 # 01 Y:2019 01 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $15,430 $10,964 Implemented
MI0352 # 12 Y:2019 12 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $518 $2,294 Implemented
MI0352 # 10 Y:2019 10 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $603 $2,315 Implemented
MI0352 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $656 $319 Implemented
MI0352 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $1,846 Implemented
MI0352 # 06 Y:2019 06 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,012 $100 Implemented
MI0352 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,725 $2,284 Implemented
MI0352 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,201 $7,920 Implemented
MI0352 # 03 Y:2019 03 2019 USE SOLAR HEAT TO HEAT WATER $7,116 $10,125 Implemented
MI0352 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $11,207 $3,600 Implemented
MI0230 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $185,551 $480 Implemented
MI0230 # 15 Y:2012 15 2012 INSTALL OCCUPANCY SENSORS $2,794 $320 Implemented
MI0230 # 14 Y:2012 14 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,550 $40 Implemented
MI0230 # 12 Y:2012 12 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,487 $2,848 Implemented
MI0230 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,962 $1,589 Implemented
MI0230 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,512 $1,040 Implemented
MI0230 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,707 $1,660 Implemented
MI0230 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,101 $41,600 Implemented
MI0230 # 03 Y:2012 03 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $88,716 $46,097 Implemented