IAC Assessment: MI0352
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0352
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2019
Principal Product Ophthalmic Lenses
NAICS 339115 - Ophthalmic Goods Manufacturing
SIC 3851 - Ophthalmic Goods
Sales $5,000,000-$10,000,000
# of Employees 64
Plant Area (Sq.Ft.) 15,000
Annual Production 158,000 Pieces
Production Hrs. Annual 3,744
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,173 691,020 kWh $0.20
Electricity Demand $20,720 2,073 kW-months/year $10.00
Electricity Fees $(-5,560) - $ -
LPG $7,116 260 MMBtu $27.37
TOTAL ENERGY COSTS $158,449
RECOMMENDED SAVINGS* $52,415 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,319
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$15,430
Cost:
$10,964
$13,391 67,975 $2,039 204 - - - - $13,391
67,975
kWh
$2,039
204
kW-months/year
-
-
$
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,207
Cost:
$3,600
$11,207 56,888 - - - - - - $11,207
56,888
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$7,116
Cost:
$10,125
- - - - - - $7,116 260 -
-
kWh
-
-
kW-months/year
-
-
$
$7,116
260
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,201
Cost:
$7,920
$5,301 26,908 $900 90 - - - - $5,301
26,908
kWh
$900
90
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,725
Cost:
$2,284
$3,205 16,271 $520 52 - - - - $3,205
16,271
kWh
$520
52
kW-months/year
-
-
$
-
-
MMBtu
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,012
Cost:
$100
- - - - $3,012 - - - -
-
kWh
-
-
kW-months/year
$3,012
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,851
Cost:
$1,846
$1,591 8,076 $260 26 - - - - $1,591
8,076
kWh
$260
26
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,571
Cost:
$1,995
$1,351 6,859 $220 22 - - - - $1,351
6,859
kWh
$220
22
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$656
Cost:
$319
$566 2,872 $90 9 - - - - $566
2,872
kWh
$90
9
kW-months/year
-
-
$
-
-
MMBtu
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$603
Cost:
$2,315
$403 2,044 $200 20 - - - - $403
2,044
kWh
$200
20
kW-months/year
-
-
$
-
-
MMBtu
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$525
Cost:
$160
$455 2,309 $70 7 - - - - $455
2,309
kWh
$70
7
kW-months/year
-
-
$
-
-
MMBtu
12: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$518
Cost:
$2,294
$448 2,275 $70 7 - - - - $448
2,275
kWh
$70
7
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$52,415
Cost:
$43,922
$37,918 192,477 $4,369 437 $3,012 - $7,116 260 $37,918
192,477
kWh
$4,369
437
kW-months/year
$3,012
-
$
$7,116
260
MMBtu
TOTAL IMPLEMENTED Savings:
$50,319
Cost:
$41,767
$36,112 183,309 $4,079 408 $3,012 - $7,116 260 $36,112
183,309
kWh
$4,079
408
kW-months/year
$3,012
-
$
$7,116
260
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG