IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 3861 Photographic Equipment And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0309 # 01 Y:2024 01 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $83,523 $250,000 Not Implemented
TT0309 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,407 $4,800 Not Implemented
TT0309 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,333 $0 Not Implemented
TT0309 # 05 Y:2024 05 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,687 $0 Not Implemented
TT0309 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,893 $157,700 Not Implemented
TT0309 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,336 $20,480 Not Implemented
TT0309 # 04 Y:2024 04 2024 REPLACE BOILER $18,200 $104,000 Not Implemented
TT0309 # 09 Y:2024 09 2024 METER WASTE WATER $4,799 $1,100 Not Implemented
TT0309 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,028 $1,500 Not Implemented
TT0309 # 10 Y:2024 10 2024 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $2,373 $430 Not Implemented
SU0540 # 07 Y:2023 07 2023 REPAIR AND ELIMINATE STEAM LEAKS $3,844 $1,670 n/a
SU0540 # 11 Y:2023 11 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $867 $1,863 n/a
SU0540 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,716 $0 n/a
SU0540 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,574 $1,108 n/a
SU0540 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,713 $788 n/a
SU0540 # 02 Y:2023 02 2023 DISCONNECT BALLASTS $568 $0 n/a
SU0540 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,316 $0 n/a
SU0540 # 10 Y:2023 10 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,779 $108,879 n/a
SU0540 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $3,016 $3,253 n/a
SU0540 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $633 $352 n/a
SU0540 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,990 $1,122 n/a
SU0538 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,330 $15,421 n/a
SU0538 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,329 $3,039 n/a
SU0538 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $870 $725 n/a
SU0538 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,300 $407 n/a