Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0182 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $0 | Not Implemented |
IP0182 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,891 | $50 | Not Implemented |
IP0182 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $950 | $1,284 | Not Implemented |
IP0182 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $203 | $172 | Not Implemented |
IP0182 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,173 | $6,828 | Not Implemented |
IP0164 # 02 Y:2022 | 02 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,853 | $2,064 | Not Implemented |
IP0164 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,649 | $1,428 | Implemented |
IP0164 # 08 Y:2022 | 08 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $489 | $2,128 | Not Implemented |
IP0164 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $216 | $803 | Implemented |
IP0164 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $972 | $1,279 | Implemented |
IP0164 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,709 | $1,228 | Implemented |
IP0164 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,851 | $1,271 | Implemented |
IP0164 # 03 Y:2022 | 03 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,643 | $1,028 | Not Implemented |
IP0158 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $132 | $44 | Implemented |
IP0158 # 10 Y:2022 | 10 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,434 | $1,250 | Not Implemented |
IP0158 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,990 | $0 | Implemented |
IP0158 # 03 Y:2022 | 03 | 2022 | USE OPTIMUM TEMPERATURE | $2,592 | $14 | Implemented |
IP0158 # 01 Y:2022 | 01 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $173 | $0 | Implemented |
IP0158 # 11 Y:2022 | 11 | 2022 | USE OPTIMUM TEMPERATURE | $837 | $763 | Not Implemented |
IP0158 # 14 Y:2022 | 14 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,629 | $9,543 | Implemented |
IP0158 # 05 Y:2022 | 05 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,753 | $187 | Not Implemented |
IP0158 # 06 Y:2022 | 06 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,314 | $467 | Implemented |
IP0158 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,812 | $52 | Implemented |
IP0158 # 07 Y:2022 | 07 | 2022 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $780 | $168 | Not Implemented |
IP0158 # 09 Y:2022 | 09 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,975 | $1,250 | Not Implemented |