IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,534

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0017 # 03 Y:1985 03 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $302 $46 Implemented
ST0017 # 04 Y:1985 04 1985 BURN WASTE PAPER FOR HEAT $10,055 $25,200 Not Implemented
ST0017 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,133 $1,900 Implemented
ST0017 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $104 Implemented
ST0017 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $1,765 $1,800 Implemented
ST0017 # 08 Y:1985 08 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,755 $1,900 Implemented
ST0017 # 09 Y:1985 09 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $605 $0 Implemented
ST0017 # 10 Y:1985 10 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,307 $1,400 Implemented
ST0017 # 11 Y:1985 11 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $439 $497 Implemented
ST0017 # 12 Y:1985 12 1985 INSTALL AUTOMATIC STACK DAMPER $603 $1,000 Not Implemented
ST0008 # 01 Y:1984 01 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $317 $0 Not Implemented
ST0008 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $59 $537 Not Implemented
ST0008 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,171 $786 Not Implemented
ST0008 # 04 Y:1984 04 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $613 $290 Not Implemented
ST0008 # 05 Y:1984 05 1984 INSTALL AUTOMATIC STACK DAMPER $310 $1,800 Not Implemented
ST0008 # 06 Y:1984 06 1984 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $112 $296 Not Implemented
ST0008 # 07 Y:1984 07 1984 RECOVER WASTE HEAT FROM EQUIPMENT $4,030 $6,000 Not Implemented
ST0008 # 08 Y:1984 08 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,296 $0 Not Implemented
ST0008 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,399 $109 Not Implemented
ST0008 # 10 Y:1984 10 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,258 $8,000 Not Implemented
ST0008 # 11 Y:1984 11 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $167,123 $24,000 Not Implemented
CO0002 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,148 $10,260 Implemented
CO0002 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,158 $300 Not Implemented
CO0002 # 03 Y:1984 03 1984 INSTALL STEAM TRAP $1,507 $254 Implemented
CO0002 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $814 $250 Not Implemented