Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,558
matching recommendationsSIC | 39 | Miscellaneous Manufacturing Industries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0136 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $325 | $675 | Not Implemented |
BS0136 # 09 Y:2020 | 09 | 2020 | USE SOLAR HEAT FOR HEAT | $9,114 | $35,799 | Not Implemented |
UK1914 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $642 | $2,510 | n/a |
UK1914 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,217 | $1,100 | n/a |
UK1914 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $0 | n/a |
UK1914 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,233 | $8,100 | n/a |
UK1914 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,187 | $0 | n/a |
UK1914 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,746 | $1,370 | n/a |
UK1914 # 07 Y:2019 | 07 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $150 | $0 | n/a |
UK1914 # 08 Y:2019 | 08 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $145 | $80 | n/a |
UK1914 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,556 | $21,155 | n/a |
UK1914 # 10 Y:2019 | 10 | 2019 | OPTIMIZE PLANT POWER FACTOR | $14,446 | $12,425 | n/a |
UF0537 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,866 | $333,760 | Not Implemented |
UF0537 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,122 | $61,119 | Not Implemented |
UF0537 # 03 Y:2019 | 03 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $14,734 | $25,470 | Not Implemented |
UF0537 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $9,846 | $1,101 | Not Implemented |
UF0537 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,091 | $8,377 | Implemented |
UF0537 # 06 Y:2019 | 06 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,428 | $500 | Implemented |
UF0537 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,046 | $914 | Implemented |
UF0537 # 08 Y:2019 | 08 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $4,046 | $6,800 | Not Implemented |
UF0537 # 09 Y:2019 | 09 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $37,600 | $100,000 | Implemented |
UF0537 # 10 Y:2019 | 10 | 2019 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $40,781 | $21,000 | Not Implemented |
LE0481 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,057 | $40 | Implemented |
LE0481 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,696 | $14,000 | Not Implemented |
LE0481 # 03 Y:2019 | 03 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,460 | $57,500 | Not Implemented |