Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0793 # 02 Y:2010 02 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $150,096 $1,969,500 Not Implemented
OK0793 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $88,705 $104,400 Implemented
OK0793 # 04 Y:2010 04 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $217,752 $100,000 Not Implemented
OK0793 # 05 Y:2010 05 2010 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $104,850 $134,480 Not Implemented
OK0793 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $8,717 $17,813 Implemented
OK0793 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,411 $69,755 Not Implemented
OK0793 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,971 $111,113 Not Implemented
OK0793 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,136 $21,130 Not Implemented
OK0793 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $67,527 $42,259 Not Implemented
OK0793 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $21,881 $4,522 Not Implemented
OK0793 # 12 Y:2010 12 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,071 $995 Implemented
OK0793 # 13 Y:2010 13 2010 UPGRADE CONTROLS ON COMPRESSORS $27,218 $30,300 Implemented
OK0217 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,396 $1,000 Implemented
OK0217 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,969 $9,033 Implemented
OK0217 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,326 $2,808 Implemented
OK0217 # 01 Y:1987 01 1987 KEEP LAMPS AND REFLECTORS CLEAN $1,521 $4,450 Not Implemented
KU0208 # 11 Y:1986 11 1986 IMPROVE LUBRICATION PRACTICES $411 $500 Implemented
KU0208 # 10 Y:1986 10 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $746 $1,000 Not Implemented
KU0208 # 09 Y:1986 09 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $363 $0 Not Implemented
KU0208 # 08 Y:1986 08 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $281 $300 Not Implemented
KU0208 # 07 Y:1986 07 1986 INSTALL AUTOMATIC STACK DAMPER $317 $600 Implemented
KU0208 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $217 $0 Implemented
KU0208 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $655 $200 Implemented
KU0208 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $295 $0 Implemented
KU0208 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $367 $100 Not Implemented