IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0306 # 02 Y:1994 02 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,295 $6,831 Implemented
MA0306 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,696 $0 Implemented
MA0306 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,761 $5,827 Implemented
MA0306 # 05 Y:1994 05 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,190 $2,829 Not Implemented
MA0306 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $519 Not Implemented
MA0278 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $417 $270 Not Implemented
MA0278 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $321 $0 Not Implemented
MA0278 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $321 $191 Not Implemented
MA0278 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $989 $1,459 Not Implemented
MA0278 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $802 $1,108 Not Implemented
MA0278 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,604 $225 Not Implemented
MA0202 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,469 $2,800 Implemented
MA0202 # 04 Y:1991 04 1991 REDUCE HEAT GAIN BY WINDOW TINTING $9,467 $37,380 Implemented
MA0202 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $196 $0 Implemented
MA0202 # 01 Y:1991 01 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $458 $1,012 Implemented
MA0106 # 02 Y:1987 02 1987 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $429 $1,250 Not Implemented
MA0106 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $917 $0 Implemented
MA0106 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $504 $1,497 Not Implemented
MA0106 # 04 Y:1987 04 1987 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,134 $5,370 Not Implemented
MA0106 # 03 Y:1987 03 1987 REPAIR OR REPLACE STEAM TRAPS $1,717 $3,445 Implemented
MA0106 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $334 $129 Implemented
MA0094 # 05 Y:1987 05 1987 OPTIMIZE PLANT POWER FACTOR $9,555 $28,800 Not Implemented
MA0094 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,442 $406 Implemented
MA0094 # 03 Y:1987 03 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,184 $9,600 Implemented
MA0094 # 02 Y:1987 02 1987 REPAIR OR REPLACE STEAM TRAPS $1,541 $600 Implemented