IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0004 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,089 $4,922 Implemented
MU0004 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $2,773 Implemented
MU0004 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $673 $0 Not Implemented
MU0004 # 05 Y:2022 05 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $250 $0 Implemented
MU0004 # 06 Y:2022 06 2022 COMBINE UTILITY METERS $180 $0 Implemented
MU0004 # 07 Y:2022 07 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $58 $77 Implemented
MU0004 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,123 $0 Implemented
UM0410 # 05 Y:2012 05 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $682 $10 Not Implemented
UM0410 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,779 $100 Implemented
UM0410 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,438 $2,000 Not Implemented
UM0410 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $7,109 $20,000 Not Implemented
UM0410 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,453 $11,580 Not Implemented
UM0367 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,913 $2,000 Implemented
UM0367 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,249 $1,158 Not Implemented
UM0367 # 02 Y:2010 02 2010 COVER OPEN TANKS $4,570 $285 Not Implemented
UM0367 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,074 $37,268 Implemented
UM0367 # 14 Y:2010 14 2010 INSTALL STORM WINDOWS AND DOORS $171 $1,400 Implemented
UM0367 # 09 Y:2010 09 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,537 $10,500 Not Implemented
UM0367 # 10 Y:2010 10 2010 USE RADIANT HEATER FOR SPOT HEATING $4,999 $8,600 Not Implemented
UM0367 # 12 Y:2010 12 2010 INSULATE BARE EQUIPMENT $573 $3,568 Not Implemented
UM0367 # 13 Y:2010 13 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $277 $329 Implemented
UM0367 # 11 Y:2010 11 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,186 $7,500 Implemented
UM0367 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,497 $200 Not Implemented
UM0367 # 06 Y:2010 06 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $27,997 $68,395 Implemented
UM0367 # 07 Y:2010 07 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,317 $9,800 Implemented