IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

632

matching recommendations
Reset
SIC 394 Toys And Sporting Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0349 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $100 Implemented
WV0368 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $11,312 $2,971 Implemented
WV0368 # 02 Y:2008 02 2008 ELIMINATE/REDUCE AN OPERATION $1,977 $1,750 Implemented
WV0368 # 03 Y:2008 03 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $825 $140 Not Implemented
WV0368 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $747 $1,927 Implemented
WV0368 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $296 $600 Not Implemented
WV0368 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $181 $60 Implemented
WV0360 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $48,535 $170,000 Not Implemented
WV0360 # 02 Y:2007 02 2007 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $44,169 $15,000 Not Implemented
WV0360 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,939 $70,000 Not Implemented
WV0360 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,938 $700 Implemented
WV0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $5,516 $1,900 Implemented
WV0360 # 06 Y:2007 06 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,399 $1,000 Implemented
WV0360 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,158 $400 Not Implemented
WV0360 # 08 Y:2007 08 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,676 $3,700 Implemented
WV0360 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $25 Implemented
WV0360 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $300 Implemented
WV0360 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,426 $900 Implemented
UD0754 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $135,639 $80,000 Implemented
UD0754 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $78,829 $0 Not Implemented
UD0754 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,891 $305,325 Implemented
UD0754 # 04 Y:2007 04 2007 MINIMIZE WATER USAGE $17,430 $700 Implemented
UD0754 # 05 Y:2007 05 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $15,400 $0 Not Implemented
UD0754 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $15,104 $5,930 Not Implemented
UD0754 # 07 Y:2007 07 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,977 $11,246 Not Implemented