Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
103
matching recommendationsSIC | 3944 | Games, Toys, and Children's Vehicles, Except Dolls and Bicycles |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0368 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $296 | $600 | Not Implemented |
WV0368 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $747 | $1,927 | Implemented |
WV0368 # 03 Y:2008 | 03 | 2008 | INSTALL SPECTRAL REFLECTORS / DELAMP | $825 | $140 | Not Implemented |
WV0368 # 02 Y:2008 | 02 | 2008 | ELIMINATE/REDUCE AN OPERATION | $1,977 | $1,750 | Implemented |
WV0368 # 01 Y:2008 | 01 | 2008 | INSULATE BARE EQUIPMENT | $11,312 | $2,971 | Implemented |
WV0368 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $181 | $60 | Implemented |
WV0360 # 05 Y:2007 | 05 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $5,516 | $1,900 | Implemented |
WV0360 # 08 Y:2007 | 08 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,676 | $3,700 | Implemented |
WV0360 # 11 Y:2007 | 11 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,426 | $900 | Implemented |
WV0360 # 10 Y:2007 | 10 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,930 | $300 | Implemented |
WV0360 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,158 | $400 | Not Implemented |
WV0360 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,939 | $70,000 | Not Implemented |
WV0360 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,188 | $25 | Implemented |
WV0360 # 01 Y:2007 | 01 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $48,535 | $170,000 | Not Implemented |
WV0360 # 02 Y:2007 | 02 | 2007 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $44,169 | $15,000 | Not Implemented |
WV0360 # 06 Y:2007 | 06 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,399 | $1,000 | Implemented |
WV0360 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,938 | $700 | Implemented |
IA0354 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $60 | Not Implemented |
IA0354 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,722 | $207 | Implemented |
IA0354 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $561 | $238 | Implemented |
IA0354 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $389 | $710 | Implemented |
IA0354 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $973 | $1,626 | Implemented |
IA0354 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $885 | $2,484 | Implemented |
MS0196 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $4,084 | $1,403 | Not Implemented |
MS0196 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,754 | $74,635 | Implemented |