Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
486
matching recommendationsSIC | 3949 | Sporting And Athletic Goods, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0372 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,030 | $800 | Not Implemented |
BD0372 # 05 Y:2010 | 05 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,363 | $4,400 | Not Implemented |
BD0372 # 06 Y:2010 | 06 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,914 | $5,000 | Implemented |
BD0372 # 07 Y:2010 | 07 | 2010 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $55,206 | $9,400 | Not Implemented |
LE0285 # 09 Y:2009 | 09 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $668 | $900 | Not Implemented |
LE0285 # 08 Y:2009 | 08 | 2009 | INSTALL OCCUPANCY SENSORS | $1,389 | $1,525 | Implemented |
LE0285 # 07 Y:2009 | 07 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $1,391 | $50 | Implemented |
LE0285 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,792 | $800 | Not Implemented |
LE0285 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,999 | $12,000 | Not Implemented |
LE0285 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,646 | $2,000 | Not Implemented |
LE0285 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,666 | $200 | Not Implemented |
LE0285 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,507 | $5,000 | Not Implemented |
LE0285 # 01 Y:2009 | 01 | 2009 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $146,916 | $900,000 | Not Implemented |
UM0349 # 01 Y:2009 | 01 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,327 | $1,000 | Implemented |
UM0349 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $5,172 | $1,840 | Implemented |
UM0349 # 03 Y:2009 | 03 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,531 | $3,168 | Implemented |
UM0349 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $479 | $100 | Implemented |
MA0593 # 13 Y:2006 | 13 | 2006 | COVER OPEN TANKS | $1,309 | $1,470 | Implemented |
MA0593 # 12 Y:2006 | 12 | 2006 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $3,677 | $1,639 | Implemented |
MA0593 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $3,510 | $3,010 | Implemented |
MA0593 # 10 Y:2006 | 10 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,718 | $12,500 | Implemented |
MA0593 # 09 Y:2006 | 09 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,140 | $6,500 | Not Implemented |
MA0593 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,919 | $170 | Implemented |
MA0593 # 07 Y:2006 | 07 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $15,042 | $22,620 | Implemented |
MA0593 # 06 Y:2006 | 06 | 2006 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $16,246 | $4,000 | Implemented |