IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 3955 Carbon Paper And Inked Ribbons
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0268 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,769 $20,880 Implemented
WV0268 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,261 $720 Implemented
WV0268 # 04 Y:2003 04 2003 IMPROVE LUBRICATION PRACTICES $1,165 $810 Not Implemented
WV0268 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,612 $250 Implemented
WV0268 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,489 $630 Not Implemented
WV0268 # 11 Y:2003 11 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,827 $1,855 Not Implemented
WV0268 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $24,688 $2,019 Implemented
WV0268 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $927 $600 Implemented
WV0268 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,404 $6,834 Implemented
WV0268 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,262 $0 Implemented
WV0268 # 12 Y:2003 12 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,545 $0 Not Implemented
WV0268 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,435 $108 Implemented
WV0268 # 13 Y:2003 13 2003 DEVELOP A REPAIR/REPLACE POLICY $6,152 $450 Implemented
CO0313 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $770 $250 Not Implemented
CO0313 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,940 $5,360 Not Implemented
CO0313 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,150 $4,170 Not Implemented
CO0313 # 03 Y:1994 03 1994 USE OTHER WASTE CONCENTRATION METHODS $2,660 $1,000 Not Implemented
CO0313 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,530 $180 Implemented
CO0313 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $2,230 Not Implemented
CO0313 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $760 $1,660 Not Implemented
CO0313 # 08 Y:1994 08 1994 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $330 $0 Not Implemented
CO0313 # 09 Y:1994 09 1994 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $450 $0 Not Implemented
MA0278 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $321 $0 Not Implemented
MA0278 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $417 $270 Not Implemented
MA0278 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $321 $191 Not Implemented