IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,414

matching recommendations
Reset
SIC 399 Miscellaneous Manufactures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0208 # 09 Y:1986 09 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $363 $0 Not Implemented
KU0208 # 10 Y:1986 10 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $746 $1,000 Not Implemented
KU0208 # 11 Y:1986 11 1986 IMPROVE LUBRICATION PRACTICES $411 $500 Implemented
MA0065 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $730 $85 Not Implemented
MA0065 # 02 Y:1986 02 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $901 $961 Not Implemented
MA0065 # 03 Y:1986 03 1986 COVER OPEN TANKS $1,330 $1,239 Not Implemented
MA0065 # 04 Y:1986 04 1986 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $410 $191 Not Implemented
GT0260 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $217 Not Implemented
GT0260 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $190 $323 Implemented
GT0260 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,084 $500 Implemented
GT0260 # 04 Y:1985 04 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $375 $936 Not Implemented
GT0260 # 05 Y:1985 05 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,032 $3,200 Implemented
AT0004 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $146 $311 Implemented
AT0004 # 02 Y:1985 02 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,630 $2,500 Implemented
AT0004 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,373 $0 Implemented
AT0004 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,342 $300 Implemented
ST0017 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,863 $953 Implemented
ST0017 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $174 $200 Not Implemented
ST0017 # 03 Y:1985 03 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $302 $46 Implemented
ST0017 # 04 Y:1985 04 1985 BURN WASTE PAPER FOR HEAT $10,055 $25,200 Not Implemented
ST0017 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,133 $1,900 Implemented
ST0017 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $104 Implemented
ST0017 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $1,765 $1,800 Implemented
ST0017 # 08 Y:1985 08 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,755 $1,900 Implemented
ST0017 # 09 Y:1985 09 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $605 $0 Implemented