Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 399 | Miscellaneous Manufactures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0222 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,898 | $12,020 | Implemented |
BD0222 # 14 Y:2002 | 14 | 2002 | AUTOMATE PAYROLL SYSTEM | $24,960 | $17,300 | Implemented |
BD0222 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $70,000 | $40,000 | Implemented |
BD0222 # 12 Y:2002 | 12 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $126 | $100 | Not Implemented |
BD0222 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10 | $200 | Not Implemented |
BD0222 # 10 Y:2002 | 10 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $652 | $0 | Not Implemented |
BD0222 # 09 Y:2002 | 09 | 2002 | INSULATE BARE EQUIPMENT | $1,141 | $1,018 | Not Implemented |
BD0222 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,901 | $2,000 | Not Implemented |
BD0222 # 07 Y:2002 | 07 | 2002 | INSTALL OCCUPANCY SENSORS | $2,219 | $1,425 | Not Implemented |
BD0222 # 06 Y:2002 | 06 | 2002 | INSTALL TURBULATORS | $2,272 | $3,500 | Not Implemented |
BD0222 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,027 | $1,000 | Not Implemented |
BD0222 # 04 Y:2002 | 04 | 2002 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $6,079 | $6,000 | Not Implemented |
BD0222 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,835 | $2,232 | Not Implemented |
BD0222 # 01 Y:2002 | 01 | 2002 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $185,274 | $20,000 | Not Implemented |
BD0222 # 15 Y:2002 | 15 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,004 | $0 | Not Implemented |
SD0297 # 06 Y:2002 | 06 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,420 | $5,000 | Not Implemented |
SD0297 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,218 | $2,728 | Not Implemented |
SD0297 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,292 | $500 | Implemented |
SD0297 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,846 | $440 | Implemented |
SD0297 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $15,891 | $500 | Implemented |
SD0297 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,530 | $39,000 | Not Implemented |
GT0726 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,034 | $3,696 | Implemented |
GT0726 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $444 | $0 | Not Implemented |
GT0726 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $115 | $185 | Implemented |
GT0726 # 03 Y:2002 | 03 | 2002 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,353 | $11,475 | Not Implemented |