IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
SIC 3991 Brooms And Brushes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0771 # 09 Y:2007 09 2007 DISCONNECT BALLASTS $304 $0 Implemented
UD0771 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $3,285 Not Implemented
UD0771 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $1,182 $1,450 Not Implemented
UD0771 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $10,000 Not Implemented
UD0771 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $0 Implemented
UD0771 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,639 $8,838 Not Implemented
UD0771 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,341 $7,780 Not Implemented
UD0771 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,208 $22,275 Not Implemented
UD0771 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,342 $600 Not Implemented
SD0297 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,530 $39,000 Not Implemented
SD0297 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $15,891 $500 Implemented
SD0297 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,292 $500 Implemented
SD0297 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,846 $440 Implemented
SD0297 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,420 $5,000 Not Implemented
SD0297 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,218 $2,728 Not Implemented
GT0726 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $444 $0 Not Implemented
GT0726 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $115 $185 Implemented
GT0726 # 03 Y:2002 03 2002 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,353 $11,475 Not Implemented
GT0726 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $377 $1,000 Implemented
GT0726 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,034 $3,696 Implemented
GT0726 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $45 $58 Not Implemented
ME0283 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $792 $210 Not Implemented
ME0283 # 06 Y:2000 06 2000 METER WASTE WATER $853 $0 Not Implemented
ME0283 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,294 $300 Implemented
ME0283 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,561 $500 Implemented