IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

343

matching recommendations
Reset
SIC 3993 Signs And Advertising Specialities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0009 # 05 Y:2012 05 2012 CHANGE PRODUCT SPECS $11,780 $0 Not Implemented
WM0009 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $200 Implemented
WM0009 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $3,162 $2,448 Implemented
WM0009 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $167 $60 Not Implemented
WM0009 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,062 $660 Not Implemented
MI0201 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,894 $2,200 Implemented
MI0201 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,900 $40 Implemented
MI0201 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,700 $1,210 Not Implemented
MI0201 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,322 $1,275 Not Implemented
MI0201 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,184 $41,193 Not Implemented
MI0201 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $18,870 $7,920 Implemented
MI0201 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,894 $2,000 Implemented
MI0201 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $36,428 $124,975 Not Implemented
IA0454 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $201 $150 Implemented
IA0454 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,152 $300 Implemented
IA0454 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $980 $400 Implemented
IA0454 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,229 $300 Implemented
IA0454 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $218 $20 Not Implemented
IA0454 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,363 $20 Not Implemented
IA0454 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $5,214 Implemented
IA0454 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,365 $1,560 Implemented
UA0055 # 01 Y:2010 01 2010 USE OPTIMUM TEMPERATURE $30,674 $1,072 Implemented
UA0055 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $12,398 $1,602 Not Implemented
UA0055 # 03 Y:2010 03 2010 USE MINIMUM SAFE OVEN VENTILATION $4,422 $990 Not Implemented
UA0055 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $14,550 $5,020 Not Implemented