IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3993 Signs And Advertising Specialities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0137 # 09 Y:2019 09 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $782 Not Implemented
WM0137 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $19,250 $106,000 Not Implemented
WM0137 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,626 $15,385 Implemented
WM0137 # 03 Y:2019 03 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,072 $3,048 Not Implemented
WM0137 # 04 Y:2019 04 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,181 $0 Not Implemented
WM0137 # 05 Y:2019 05 2019 USE RADIANT HEATER FOR SPOT HEATING $2,291 $2,780 Implemented
WM0137 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $2,143 $2,415 Not Implemented
WM0137 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,865 $1,164 Not Implemented
WM0137 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $629 $1,920 Implemented
WM0074 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $2,174 $0 Implemented
WM0074 # 09 Y:2015 09 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,625 $1,774 Implemented
WM0074 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $225 Implemented
WM0074 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,530 $50,000 Not Implemented
WM0074 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,738 $15,750 Not Implemented
WM0074 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,746 $6,310 Not Implemented
WM0074 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,763 $305 Not Implemented
WM0074 # 03 Y:2015 03 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,126 $860 Not Implemented
WM0074 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,192 $0 Not Implemented
WM0009 # 06 Y:2012 06 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $12,250 $19,000 Not Implemented
WM0009 # 05 Y:2012 05 2012 CHANGE PRODUCT SPECS $11,780 $0 Not Implemented
WM0009 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $200 Implemented
WM0009 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $3,162 $2,448 Implemented
WM0009 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $167 $60 Not Implemented
WM0009 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,062 $660 Not Implemented
WI0226 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $3,891 $11,655 Not Implemented