Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 3993 | Signs And Advertising Specialities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0268 # 09 Y:2014 | 09 | 2014 | ISOLATE HOT OR COLD EQUIPMENT | $22,002 | $26,830 | Not Implemented |
MI0268 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $139,206 | $330,000 | Not Implemented |
MI0268 # 02 Y:2014 | 02 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $70,433 | $80 | Not Implemented |
MI0268 # 03 Y:2014 | 03 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $58,931 | $93,833 | Not Implemented |
MI0268 # 04 Y:2014 | 04 | 2014 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $47,940 | $1,400 | Not Implemented |
MI0268 # 05 Y:2014 | 05 | 2014 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $33,525 | $8,960 | Not Implemented |
MI0268 # 06 Y:2014 | 06 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $33,490 | $80 | Not Implemented |
MI0268 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,776 | $62,320 | Not Implemented |
MI0268 # 08 Y:2014 | 08 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $27,155 | $33,600 | Not Implemented |
MI0268 # 10 Y:2014 | 10 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $18,560 | $640 | Not Implemented |
MI0268 # 11 Y:2014 | 11 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,297 | $1,660 | Not Implemented |
MI0268 # 12 Y:2014 | 12 | 2014 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $7,749 | $800 | Not Implemented |
MI0268 # 13 Y:2014 | 13 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,686 | $3,200 | Not Implemented |
MI0268 # 14 Y:2014 | 14 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,659 | $9,784 | Not Implemented |
MI0268 # 15 Y:2014 | 15 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $5,676 | $20,960 | Not Implemented |
MI0268 # 16 Y:2014 | 16 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,110 | $4,800 | Not Implemented |
MI0268 # 17 Y:2014 | 17 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,625 | $80 | Not Implemented |
BS0035 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,413 | $8,156 | Implemented |
BS0035 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $65 | $132 | Implemented |
BS0035 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $89 | $113 | Implemented |
BS0035 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $374 | $15 | Implemented |
BS0035 # 05 Y:2014 | 05 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,366 | $24,165 | Implemented |
BS0035 # 06 Y:2014 | 06 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,299 | $50 | Implemented |
BS0035 # 07 Y:2014 | 07 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,773 | $13,800 | Not Implemented |
BS0035 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $452 | $340 | Implemented |