IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 3995 Burial Caskets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2013 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,416 $4,336 Implemented
CL2013 # 03 Y:2020 03 2020 ISOLATE HOT OR COLD EQUIPMENT $1,527 $461 Implemented
CL2013 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,311 $0 Implemented
CL2013 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,650 $33,470 Implemented
IP0139 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $37,750 $333,343 Not Implemented
IP0139 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $647 $1,350 Implemented
IP0139 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,001 $51,911 Implemented
IP0139 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,551 $36 Implemented
IP0139 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,243 $0 Implemented
IP0064 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $382 $888 Implemented
IP0064 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $3,007 Implemented
IP0064 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $878 Implemented
IP0064 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,082 $700 Implemented
IP0064 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,306 $250 Implemented
IP0064 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $398 $5 Implemented
IP0064 # 01 Y:2016 01 2016 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $839 $0 Implemented
IP0032 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,263 $0 Implemented
IP0032 # 03 Y:2014 03 2014 USE SOLAR HEAT TO HEAT WATER $69,019 $314,300 Not Implemented
IP0032 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $659 $556 Implemented
IP0032 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $16,018 Implemented
TT0016 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $19,000 $19,750 Not Implemented
TT0016 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,553 $42,900 Implemented
TT0016 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $17,400 $50,000 Implemented
TT0016 # 02 Y:2008 02 2008 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,929 $1,500 Not Implemented
MS0297 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,825 $225 Implemented