Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3995 | Burial Caskets |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0139 # 05 Y:2020 | 05 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,750 | $333,343 | Not Implemented |
IP0139 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $647 | $1,350 | Implemented |
IP0139 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,243 | $0 | Implemented |
IP0139 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,551 | $36 | Implemented |
IP0139 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $84,001 | $51,911 | Implemented |
IP0064 # 01 Y:2016 | 01 | 2016 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $839 | $0 | Implemented |
IP0064 # 02 Y:2016 | 02 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $398 | $5 | Implemented |
IP0064 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,306 | $250 | Implemented |
IP0064 # 04 Y:2016 | 04 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,082 | $700 | Implemented |
IP0064 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $538 | $878 | Implemented |
IP0064 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $382 | $888 | Implemented |
IP0064 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $893 | $3,007 | Implemented |
IP0032 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $659 | $556 | Implemented |
IP0032 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,644 | $16,018 | Implemented |
IP0032 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,263 | $0 | Implemented |
IP0032 # 03 Y:2014 | 03 | 2014 | USE SOLAR HEAT TO HEAT WATER | $69,019 | $314,300 | Not Implemented |
UD0735 # 16 Y:2006 | 16 | 2006 | INSULATE BARE EQUIPMENT | $245 | $110 | Implemented |
UD0735 # 15 Y:2006 | 15 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $376 | $214 | Not Implemented |
UD0735 # 14 Y:2006 | 14 | 2006 | USE PHOTOCELL CONTROLS | $733 | $308 | Implemented |
UD0735 # 13 Y:2006 | 13 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,293 | $0 | Not Implemented |
UD0735 # 12 Y:2006 | 12 | 2006 | RECOVER AND REUSE COOLING WATER | $2,635 | $1,000 | Not Implemented |
UD0735 # 11 Y:2006 | 11 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,665 | $0 | Implemented |
UD0735 # 10 Y:2006 | 10 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,932 | $0 | Not Implemented |
UD0735 # 09 Y:2006 | 09 | 2006 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $3,767 | $700 | Not Implemented |
UD0735 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,043 | $9,000 | Not Implemented |