IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 3999 Manufacturing Industries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0535 # 12 Y:2015 12 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $161 $100 Not Implemented
NC0535 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,964 $9,077 Implemented
NC0535 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $1,846 Not Implemented
NC0535 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $667 $2,297 Implemented
NC0535 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $320 Not Implemented
NC0535 # 05 Y:2015 05 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $214 $188 Not Implemented
NC0535 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $917 $200 Not Implemented
NC0535 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $1,766 $8,146 Not Implemented
NC0535 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,917 $100 Implemented
NC0535 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,975 $1,750 Implemented
NC0535 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $100 Implemented
NC0535 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,512 $8,000 Not Implemented
NC0535 # 13 Y:2015 13 2015 INSTALL TIMERS AND/OR THERMOSTATS $8,643 $1,000 Not Implemented
TN0615 # 01 Y:1997 01 1997 MOVE PRODUCT USING MECHANICAL MEANS $24,785 $73,860 Not Implemented
TN0615 # 02 Y:1997 02 1997 MODIFY CURRENT INCENTIVE PROGRAM $27,000 $10,000 Not Implemented
TN0615 # 03 Y:1997 03 1997 USE RADIANT HEATER FOR SPOT HEATING $16,845 $13,160 Implemented
TN0615 # 04 Y:1997 04 1997 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $17,115 $12,040 Not Implemented
TN0615 # 05 Y:1997 05 1997 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,850 $13,650 Not Implemented
TN0615 # 06 Y:1997 06 1997 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $6,995 $16,930 Not Implemented
TN0615 # 07 Y:1997 07 1997 COVER OPEN TANKS $5,350 $300 Not Implemented
TN0615 # 08 Y:1997 08 1997 RECOVER WASTE HEAT FROM EQUIPMENT $830 $2,525 Not Implemented
TN0615 # 09 Y:1997 09 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $540 $1,490 Not Implemented
TN0615 # 10 Y:1997 10 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $255 $280 Implemented
NC0064 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,764 $1,570 Not Implemented
NC0064 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $2,830 $278 Not Implemented