IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0627 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $10,323 $17,350 Implemented
OR0627 # 08 Y:2014 08 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,937 $129,750 Not Implemented
OR0627 # 09 Y:2014 09 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,631 $4,602 Not Implemented
OR0627 # 10 Y:2014 10 2014 USE PHOTOCELL CONTROLS $3,741 $7,191 Implemented
OR0627 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,856 $39,597 Implemented
BS0029 # 01 Y:2014 01 2014 INCREASE EFFICIENCY OF TRUCKS $19,366 $24,000 Not Implemented
BS0029 # 02 Y:2014 02 2014 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $57,736 $307,920 Not Implemented
BS0029 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,130 $3,375 Not Implemented
BS0029 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $29 Not Implemented
BS0029 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,677 $726 Not Implemented
BS0029 # 06 Y:2014 06 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,602 $33,371 Not Implemented
SF0445 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,564 $0 Implemented
SF0445 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,245 $0 Implemented
SF0445 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,086 $16,174 Not Implemented
SF0445 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,993 $21,342 Implemented
SF0445 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,822 $90,352 Not Implemented
MA0722 # 01 Y:2014 01 2014 USE POWER DURING OFF-PEAK PERIODS $11,298 $500 Implemented
MA0722 # 02 Y:2014 02 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,940 $1,500 Not Implemented
MA0722 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,147 $9,900 Not Implemented
MA0722 # 04 Y:2014 04 2014 REDUCE VENTILATION AIR $2,443 $3,000 Not Implemented
MA0722 # 05 Y:2014 05 2014 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,818 $2,750 Not Implemented
MA0722 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,742 $1,450 Not Implemented
MA0722 # 07 Y:2014 07 2014 REDUCE VENTILATION AIR $1,630 $3,750 Not Implemented
MA0722 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $998 $200 Implemented
MA0722 # 09 Y:2014 09 2014 PAY UTILITY BILLS ON TIME $949 $500 Not Implemented