IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,604

matching recommendations
Reset
SIC 4952 Sewerage Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0604 # 08 Y:2023 08 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $10,959 $0 Implemented
AM0889 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $1,550 Implemented
AM0889 # 02 Y:2023 02 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,570 $4,570 Implemented
AM0889 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $5,800 $11,040 Not Implemented
AM0889 # 04 Y:2023 04 2023 USE SYNTHETIC LUBRICANT $450 $63 Not Implemented
AM0889 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $170 $47 Implemented
CM1021 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $90,579 $941,260 n/a
CM1021 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,426 $981 n/a
CM1021 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $427 $730 n/a
CM1021 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,522 $4,636 n/a
CM1021 # 05 Y:2023 05 2023 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $18,330 $246,610 n/a
CM1021 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $34,069 $800 n/a
MA0862 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,262 $30,900 n/a
MA0862 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,114 $20,600 n/a
MA0862 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,241 $55,000 n/a
MA0862 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,416 $78,169 n/a
MA0862 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $4,461 $14,400 n/a
MA0862 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,059 $800 n/a
MA0862 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $2,160 n/a
MA0861 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $98,833 $861,320 n/a
MA0861 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,846 $17,375 n/a
MA0861 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,273 $19,000 n/a
MA0861 # 04 Y:2023 04 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,254 $18,500 n/a
MA0861 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,245 $1,250 n/a
MA0860 # 01 Y:2023 01 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,991 $1,650 n/a