Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 4952 | Sewerage Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MUWT06 # 10 Y:2024 | 10 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $7,951 | $0 | n/a |
MUWT06 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $669 | $4,646 | n/a |
MUWT06 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $106 | $0 | n/a |
MUWT06 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20 | $20 | n/a |
MUWT06 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,582 | $8,363 | n/a |
MUWT06 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,139 | $563 | n/a |
MUWT06 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,226 | $5,494 | n/a |
MUWT06 # 07 Y:2024 | 07 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,231 | $0 | n/a |
MUWT06 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,263 | $0 | n/a |
MUWT06 # 09 Y:2024 | 09 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,478 | $6,690 | n/a |
MUWT05 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68 | $20 | n/a |
MUWT05 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,236 | $61,596 | n/a |
MUWT05 # 09 Y:2024 | 09 | 2024 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $2,580 | $543 | n/a |
MUWT05 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $707 | $2,816 | n/a |
MUWT05 # 07 Y:2024 | 07 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5 | $0 | n/a |
MUWT05 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $124 | $49 | n/a |
MUWT05 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $766 | $2,052 | n/a |
MUWT05 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $178 | $0 | n/a |
MUWT05 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,300 | $2,373 | n/a |
MUWT05 # 01 Y:2024 | 01 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,094 | $9,376 | n/a |
MUWT01 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $539 | $2,176 | Not Implemented |
MUWT01 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $70 | $0 | Not Implemented |
MUWT01 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $206 | $960 | Not Implemented |
MUWT01 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $715 | $0 | Implemented |
MUWT01 # 05 Y:2023 | 05 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $120 | $0 | Implemented |